Warp knitting facility 2
This division was re-equipped in the year 2002.
The state-of-the-art machinery enables
-
the use of huge warp beams
-
winding on rising roll batchers, which allows the use of large rolls
-
a width of up to 550 cm,
-
full monitoring of the division by cameras and linking to warp knitting facility 1 by means of a TV transmission unit,
-
monitoring of all machines with three fault monitoring units,
-
the design of the division to handle ghost shifts in every respect.
For reasons of security / safety, both warp knitting facilities 1 and 2 are now monitored by TV during ghost shifts, with pictures being transmitted into the knitting facility which operates 24/7.